Residential Construction
Bathroom Remodeling
Full bathroom remodels across Broward, Palm Beach, and Miami-Dade, built from the studs out with waterproofing done right the first time.
Waterproofing done right
Walk-in and curbless showers
Accessibility built in
CGC1530039
Certified General Contractor
CCC1334142
Certified Roofing Contractor
Broward CBE
Certified Business Enterprise
Tri-County
Broward · Palm Beach · Miami-Dade
Before and After
From Cement Board to Finished Shower
The work that matters most is the part you never see once the tile is up. Here is one of our primary bathroom remodels before tile and after completion.


Scope
What We Build
Walk-In Showers
Including curbless and low-threshold designs.
Tub-to-Shower Conversions
Drain, valve, and waterproofing rebuilt as part of the conversion.
Tile
Floors, walls, niches, and accent details.
Vanities and Fixtures
Vanities, tops, faucets, and frameless glass.
Ventilation
Exhaust fans vented to the exterior, not the attic.
Accessibility
Grab bar blocking, wider doorways, and low-threshold entries.
Waterproofing
Tile Is Not Waterproof
What keeps water out of your walls and subfloor is the pan, the membrane, and the details at the curb, niches, and valve.
Through FirstLine Restoration, our team regularly sees what failed showers do behind the tile. That is why we treat waterproofing as the most important part of every bathroom we build.
Where showers fail
- The pan. Sloped and waterproofed to the drain.
- The curb. Membrane wrapped, not just tiled over.
- Niches and benches. Sloped and sealed at every seam.
- The valve. Penetrations sealed behind the wall.
Planning to Stay in Your Home?
Blocking for grab bars, a low or curbless shower entry, and a wider doorway cost little during a remodel and a lot to add later. It is worth building in now, even if you do not need it yet.
Answers
Frequently Asked Questions
How long does a bathroom remodel take?
Timing depends on scope, permits, and material lead times. We give you a schedule once selections are made.
Can a tub be converted to a walk-in shower?
Yes. It is one of the most common remodels we do.
Do bathroom remodels need permits?
Work that moves plumbing, adds electrical, or alters structure requires a permit. We permit the work that requires it.
What if you find water damage behind the tile?
We document it, explain the options, and agree on the repair before closing the walls. Our restoration experience helps us assess it accurately.
Keep Exploring
Explore Related Services
Free Consultation
Start Your Bathroom Remodel
FirstLine Construction Corp. is a Florida Certified General Contractor (CGC1530039) and Broward County CBE-certified firm serving Broward, Palm Beach, and Miami-Dade counties. Tell us about your project and we will schedule a site visit.
